In 1960 the Smelter’s concentrate melting capacity reached 1,400 t/day; In addition, the railway and the industrial port were put into operation in Ilo, Moquegua, Peru. T
![Historia-1960](https://southerncoppercorp.com/eng/wp-content/uploads/sites/2/2022/05/Historia-1960-550x275.jpg)
In 1960 the Smelter’s concentrate melting capacity reached 1,400 t/day; In addition, the railway and the industrial port were put into operation in Ilo, Moquegua, Peru. T